Showcase
-
Image 1
Well, this is what the jeep looked like at the end of the competition season 2008.
-
Image 2
Work begins to tear it down to the frame.
-
Image 3
Time to unbolt everything.
-
Image 4
The entire interior needed taken apart as well.
-
Image 5
That's our rats nest we call our wiring harness.
-
Image 6
Everything is unbolted, time to remove the body tub.
-
Image 7
Thanks to Davey's Jeeps, here is our new body tub.
-
Image 8
Now we need to remove all pieces from this tub.
-
Image 9
Works begins to get this tub ready.
-
Image 10
We had to cut a lot on this tub to make the holes in it like the previous tub.
-
Image 11
Cutting the floor for access panels to the transfer case.
-
Image 12
Loading the tub up to get lined.
-
Image 13
The bare steel tub before we got it sprayed.
-
Image 14
Thanks to Line-X in Akron. They jumped on board and lined the inside and underside of the tub.
-
Image 15
This is cool - they had a plastic piece of their logo. They sandwiched it in the layers of spray to make it stand out.
-
Image 16
The tub is prepped for painting.
-
Image 17
We had some body work to do to the tub before it was painted.
-
Image 18
Our new seat covers - thank you Mastercraft!
-
Image 19
New paint job!
-
Image 20
The new paint job makes the Line-X stand out.
-
Image 21
We've been working hard.
-
Image 22
New rear corners, courtest of Gen-Right Off Road.
-
Image 23
New fuel cell.
-
Image 24
Seats and cage now installed in the body tub.
-
Image 25
Starting to look like a Jeep again.
-
Image 26
Time to start pulling some wire.
-
Image 27
Notice we painted our winch black. The red was clashing.
-
Image 28
Almost done.
-
Image 29
Test fitting the hood to line up the front end.
-
Image 30
The new interior layout.
-
Image 31
Finally moved it out of the garage.
-
Image 32
It runs and moves!
-
Image 33
Selway checking the gauges and switches.
